| No |
Contract Name |
Location |
Client Company |
Start Date |
End Date |
| 1 |
205th Commando Site Facilites Construction |
Kandahar |
Weston Solutions Inc
AFCEE |
Apr-2008 |
Jun-2009 |
| 2 |
Extension of Maintenance Shop Catwalk and Living Containers |
Bagram Air Field Kabul |
Inglett & Stubbs International Co |
Apr-2008 |
May-2008 |
| 3 |
General Construction Services in Kabul Air Port |
Kabul |
DynCorp International LLC
USACE |
May-2008 |
Oct-2008 |
| 4 |
Afghan National Army Communication Network, South Provinces |
Hilmand & Zabul |
Network Innovation Inc
U.S. DoD |
May-2008 |
Jan-2009 |
| 5 |
209th Commando Battalion Compound and Forward Supply Depot |
Mazar-E-Sharif , Balkh |
CH2M HILL Constructions Co
AFCEE |
Sep-2008 |
Jul-2010 |
| 6 |
Satellite Antenna Foundation |
Kabul |
Globecomm Systems, Inc USA |
Nov-2008 |
Jan-2009 |
| 7 |
Afghan National Army Strategic Communication Network, CMW |
Kabul |
Network Innovation Inc |
May-2009 |
Jul-2009 |
| 8 |
Communication Towers Remediation |
Camp Phoenix & Eggers Kabul |
LGS Innovations LLC |
Aug-2009 |
Mar-2010 |
| 9 |
U.S. Embassy Mazar Consulate Project |
Mazar-E-Sharif, Balkh |
PAE
U.S. DoS |
Jan-2010 |
Mar-2011 |
| 10 |
Compound Modification Project |
Kandahar |
IAP |
Dec-2010 |
Oct-2011 |
| 11 |
CLASS I Warehouse Expansion Project |
Kabul |
Lakeshore / USACE |
Apr-2011 |
Jul-2012 |
| Total Program Revenue: $42,000,000.00 USD |
|
COMPLETED PROJECTS |
| 1. |
205th Commando Site Facilities Construction |
|
| The scope of this project was to provide the planning and Construction of the Commando Compound Base in Kandahar for the Afghan National Police. |
| The project consisted of the Design and Construction of the following facilities: |
| |
TYPE OF BUILDING |
QTY |
SQM |
AREA |
 |
Arm Storage |
1 |
350 sm |
350.00 |
 |
Barracks Type A1 |
2 |
480.4 sm |
960.80 |
 |
Barracks Type A2 |
1 |
487.60 sm |
487.60 |
 |
Barracks Type B |
5 |
416 sm |
2,080.00 |
 |
Battalion Head Quarters |
1 |
350 sm |
350.00 |
 |
Battalion Storage |
1 |
800 sm |
800.00 |
 |
BOQ Type A |
1 |
70 sm |
70.00 |
 |
BOQ Type B |
1 |
570 sm |
570.00 |
 |
Company Head Quarter |
4 |
59.6 sm |
238.40 |
 |
DFAC |
1 |
810 sm |
810.00 |
 |
Exercise Area |
1 |
5525 sm |
5,525.00 |
|
Fitness Center |
1 |
300 sm |
300.00 |
 |
Gang Toilet |
1 |
567 sm |
567.00 |
 |
Laundry |
1 |
70 sm |
70.00 |
 |
Motor pool |
1 |
3500 sm |
3,500.00 |
 |
Pol Storage |
1 |
25 sm |
25.00 |
 |
Training Buildings |
2 |
200 sm |
400.00 |
 |
Vehicle Maintenance Bay |
1 |
400 sm |
400.00 |
| |
TOTAL AREA |
17,503.80 |
|
| 2. |
Extension of Maintenance Shop, Catwalk and Living Containers |
 |
This project consisted of constructing an extension to the Inglett and Stubs Maintenance Shop, and the addition to the existing catwalk of the Inglett and Stubs Living containers at Bagram Air Field. |
|
| 3. |
General Construction Services in Kabul Air Port |
| The scope of this project was the relocation of DEA Hanger and construction of a new concrete pad for the Hanger, including options to construct an Office Building and a Storage Building. |
 |
|
| The project consisted of the Design and Construction of the following facilities: |
 |
Airplane Hanger |
 |
Water Distirbution |
 |
Power Generation & Distribution |
 |
Assembly and Erecting of |
| |
 |
100 x 60 m Apron |
 |
40 x 60 m Storage area |
 |
20 x 40 m Office Space |
|
|
| 4. |
Afghan National Army Communication Network |
|
| All the Designs and Construction Codes were in compliance with International Building Codes and the requirements of Network Innovation Inc and U.S. DoD. |
| 5. |
209th Commando Battalion Compound and Forward Supply Depot |
|
| The scope of this project was to provide the planning and Construction of the Commando Compound Base in Mazar-E-Sharif for the Afghan National Police. |
| The project consisted of the Design and Construction of the following facilities: |
|
| |
TYPE OF BUILDING |
QTY |
SQM |
AREA |
 |
Arm Storage |
1 |
349.68 sm |
349.68 |
 |
Barracks A1 |
2 |
480.40 sm |
960.80 |
 |
Barracks A2 |
1 |
523.20 sm |
523.20 |
 |
Barracks B |
5 |
447.60 sm |
2,238.00 |
 |
Battalion Head Quarter |
1 |
381.89 sm |
381.89 |
 |
Battalion Storage |
1 |
800.88 sm |
800.88 |
 |
Base Officer Quarters |
1 |
662.03 sm |
662.03 |
 |
Base Officer Quarters |
1 |
688.94 sm |
688.94 |
 |
Base Officer Quarters |
1 |
95.34 sm |
95.34 |
 |
Base Officer Quarters |
1 |
576.74 sm |
576.74 |
 |
Company Head Quarter |
4 |
58.40 sm |
233.60 |
 |
DFAC |
1 |
809.99 sm |
809.99 |
 |
DFAC in FSD Site |
1 |
1794 sm |
1,794.00 |
 |
Enlisted Barracks |
1 |
583.41 sm |
583.41 |
 |
Existing Warehouse |
1 |
1555.35 sm |
1,555.35 |
 |
Fitness Center |
1 |
304.80 sm |
304.80 |
 |
Fuel Storage |
1 |
602.00 sm |
602.00 |
 |
Gant Latrine |
1 |
637.39 sm |
637.39 |
 |
Guard house |
2 |
9.00 sm |
18.00 |
 |
Motor Pool |
1 |
3907.99 sm |
3,907.99 |
 |
NCO/Enlisted Barracks |
1 |
665.62 sm |
665.62 |
 |
Pol Storage |
1 |
25 sm |
25.00 |
 |
SNCO/Officer Barracks |
1 |
396.96 sm |
396.96 |
 |
Solid Waste |
1 |
9.00 sm |
9.00 |
 |
Training Buildings |
1 |
400.00 sm |
400.00 |
 |
Vehicle Maintenance Bay |
1 |
400.00 sm |
400.00 |
 |
Vehicle Maintenance with Class 1 Storage |
1 |
991.67 sm |
991.67 |
| |
TOTAL AREA |
20,612.28 |
|
| All the Designs and Construction was in compliance with International Building Codes and the requirements of CH2M Hill and AFCE. |
| 6. |
Satellite Antenna Foundation |
| This project consisted of Engineering, Furnishing, Installing and testing of the following Satellite Antenna components: |
 |
 |
ASC signal 9.3m 4.port circular polarized antenna |
 |
1:2 redundant LNA System |
 |
1:2 redundant 400w TWTA system |
 |
Dual 8-way transmit combiners |
 |
Dual 16-way receive dividers |
 |
Wave guide pressurization and dehydrator |
 |
Transmit and receive RF IFLs and overhead gantry |
 |
Civil Works |
 |
Logistics |
|
|
| 7. |
Afghan National Army Strategic Communication Network, CMW |
 |
 |
Fiber optic cable OFC running |
 |
Trenching and lay down the conduits for outside plan copper and OFC cable |
 |
Provide and install hand holes and manholes |
 |
All cable pulling on site plan |
 |
Installation of communication pull box and cabinets |
 |
Providing all grounding systems |
|
|
| 8. |
Communication Towers Remediation |
The scope of this project was to remediate physical and operational deficiencies associated with two communications towers belonging to the U.S. Government located at camp Eggers and camp Phoenix.
Grounding and LPS were not properly installed on the system and the requirement was to repair this without disconnecting the communication.
|
 |
|
| 9. |
U.S. Embassy Mazar Consulate Project |
|
The scope of this project consisted of converting an existing Hotel structure to accommodate the U.S. Consulate in Mazar. This included the replacement of all infrastructure including water, sewer, electrical and communications facilities while maintaining the Architectural and structural systems of the building in accordance with U.S. Building Codes. |
| |
|
| 10. |
Compound Modification Project |

|
| This project consists of the following key elements: |
 |
Demolition of existing structures and facilities |
 |
Installation and synchronization of two 900KVA Generators. |
 |
Installation of below grade fuel supply system |
 |
Construction of generator building. |
 |
Provision of temporary power to ensure constant uninterrupted energy source to pre-existing compound facilities for the duration of the entire project. |
|
|
|
| 11. |
CLASS I Warehouse Expansion Project |
| The project consists of the design and construction of nine buildings, a Vehicle Refueling Point with Fuel Storage, two guard towers, and approximately 565m of Sniper Screen on perimeter fence, demolition of an existing guard tower and barracks and 845m2 of existing roadway, construction of additional roads, sidewalks, and parking areas. Also included is connection of the new structures to existing base utility systems (water, sanitary, communications, drainage, and electrical). |
|
 |